Ayios Silas Industrial Area, 2008 - 2009
Designed and built in just 11 months, the global HQ offices presented a challenge in their design, as well as the logistics. A modular design with the capability of interior expansion in any direction provide a perfect solution for a company with a rapid growth and unknown spatial parameters. Enclosed in an outer 'bland' shell, the exterior and interior could not be more opposite in concept